P5 · INTEGRATED CONTROLS

Establishing Integrated Project & Program Controls

Become the practitioner who establishes, operates and assures the Pi v2.0 controls cycle — the integrated controls strategy and progress measurement rules, earned value at Master and Package level, change control with cross-domain impact, credible cost and schedule forecasts, governed baseline change, and the independent health check that protects the whole system.

Program 512 courses · Foundation to ExpertPi System v2.0 aligned
Register interestExplore the curriculum
Pi System v2.0 aligned
Governance, Master & Package levels
Integrated Project Controls · primary domain
Approved by PIOTICON C&D Governance
The program

A controls system is only credible if it is operated on a cadence — and assured.

P5 develops integrated controls professionals who can establish, operate and assure the Pi v2.0 Master and Package-level controls cycle. You author the Integrated Controls Strategy (M-510) and Progress Measurement Rules (M-270), run the Earned Value Performance Report (M-530), administer the Change Control & Configuration System (M-520), produce credible cost and schedule forecasts (M-350, M-240), govern internal baseline change (M-340, M-660), and validate system integrity through periodic health and maturity assessment (G-560, G-570).

It receives the approved integrated master schedule (M-220) from P1, cost baseline inputs from P2 and P3, and risk inputs (M-410, M-420, M-430, M-460) from P4 — then hands the standard performance pack to P6 for advanced intelligence and the assurance outputs to P7 governance. Detail-level field controls remain with P9.

Program codeP5
Pi levelsMaster, Package, and Governance (Course 14)
Primary domainIntegrated Project Controls
Tier mix1 Foundation · 7 Intermediate · 4 Advanced · 2 Expert
PDCA emphasisCheck-heavy — 7 Check, 5 Do, 1 Plan, 1 Act
CapstoneTwo full controls cycles, closed by independent assurance
Audience

Built for the people who own the performance position.

Controls, cost, planning and assurance professionals on mega projects — the roles that author, operate and assure the controls cycle, listed verbatim from the Pi v2.0 Roles Register.

The people who own the performance position, cycle after cycle.
Project Control Manager
Owns the integrated controls operating model and the periodic cycle.
Project Control Engineer
Operates earned value, change control and the register set.
Cost Controller
Runs cost performance, variance and the approved cost baseline.
Planning Engineer
Reviews schedule performance and refreshes the forecast.
Reporting Analyst
Produces the combined performance pack and decision packs.
Package Manager
Operates Work Package earned value and change at package level.
Risk Manager
Co-delivers scenario validation and what-if analysis.
Project Director
Approves internal baseline change and signs off assurance.
Independent Reviewer
Runs the controls health check and maturity assessment.
What you'll be able to do

Seven capabilities a graduate walks away with.

Every outcome is a thing you'll be able to do on a live project — not a topic you'll have heard about.

Author a Pi v2.0 Integrated Controls Strategy (M-510) and Progress Measurement Rules (M-270) that integrate scope, schedule, cost, risk and reporting into a single Master-level operating cadence.
Operate the Master-level Earned Value Performance Report (M-530) end-to-end: progress measurement, BCWS/BCWP/ACWP integration, productivity review, and CPI/SPI interpretation.
Run the Change Control & Configuration System (M-520) covering scope, schedule and cost change initiation, with auditable cross-domain impact assessment via M-750.
Produce credible periodic forecasts (M-350 Cost Forecast EAC/ETC, M-240 Progress Updated Master Schedule & Forecast) supported by a defensible variance register (M-370) and schedule health view (M-250).
Operate the Package-level controls subset: I-530 Work Package Earned Value Update, I-170 Work Package Change Register, I-540 Work Package Combined Performance Report.
Run the Master-level scenario validation cycle (MC11/MC12 → M-630) and the integrated issues and decisions cycle (M-180, M-740, M-660) for internal baseline change approval.
Conduct an independent Controls Health Check (G-560) and Controls Maturity Assessment (G-570) via GC01 — the closing assurance step that protects the credibility of the controls system.
The curriculum

Fourteen courses — architecture, then operations, then assurance.

Course 1 sets the strategy and the rules. Courses 2 to 10 build the operational cycle at Master and Package level. Courses 11 to 13 add the judgement layers. Course 14 closes the assurance loop.

Tap any course to expand its detail
01P5.C01Integrated Controls Strategy & Operating ModelFoundationInt. Controls

Sets the Integrated Controls Strategy (M-510) and Progress Measurement Rules (M-270) via MP11–MP15 — the operating model every downstream P5 course runs inside. Worked examples and template walkthroughs.

Deliverables built
M-510 · Integrated Controls StrategyM-270 · Progress Measurement Rules
Pi level — Master
02P5.C02Earned Value Management (EVM) CoreIntermediateInt. Controls

Build the Master-level Earned Value Performance Report (M-530) end to end via MD01, MD03–MD05 and MC01: progress measurement, BCWS/BCWP/ACWP integration and productivity review. Required for Courses 6 and 9.

Deliverables built
M-530 · Earned Value Performance Report
Pi level — Master
03P5.C03Schedule Performance Measurement & ForecastingIntermediateSchedule

Review schedule performance and refresh the forecast via MC02 and MC06 — M-240 Progress Updated Master Schedule & Forecast and M-250 Schedule Health & Quality Assessment. Pairs with Course 4 in the periodic cycle.

Deliverables built
M-240 · Progress Updated Master Schedule & ForecastM-250 · Schedule Health & Quality Assessment
Pi level — Master
04P5.C04Cost Performance Measurement & VarianceIntermediateCost

Review cost performance via MC03, MC05 and MC07 to produce M-350 Cost Forecast (EAC / ETC) and a defensible M-370 Cost Trend & Variance Register. Pairs with Course 3 in the periodic cycle.

Deliverables built
M-350 · Cost Forecast (EAC / ETC)M-370 · Cost Trend & Variance Register
Pi level — Master
05P5.C05Change Control & Configuration ManagementIntermediateInt. Controls

Operate the Change Control & Configuration System (M-520) via MD06–MD08 — scope, schedule and cost change initiation with an auditable trail. Pre-requisite for Course 11 cross-domain change impact.

Deliverables built
M-520 · Change Control & Configuration System
Pi level — Master
06P5.C06Advanced EVM: Forecasting & Trend AnalyticsAdvancedInt. Controls

Advance forecasting and trend analytics on M-530 and M-350 via MC03 and MC05: forecast credibility, trend interpretation and the narrative that connects variance to forecast change. Required before Course 13.

Deliverables built
M-530 · Earned Value Performance ReportM-350 · Cost Forecast (EAC / ETC)
Pi level — Master
07P5.C07Work Package Earned Value UpdateIntermediateInt. Controls

Operate the Work Package Earned Value Update (I-530) via ID01, ID03–ID05 — subcontract quantity progress, periodic value of work done, claims and supplier payments. The Package-level mirror of Course 2.

Deliverables built
I-530 · Work Package Earned Value Update
Pi level — Package
08P5.C08Work Package Change RegisterIntermediateInt. Controls

Operate the Work Package Change Register (I-170) via ID06–ID08 — scope or unit-rate change, schedule change affecting forecast dates, and package-wise cost change. The Package-level mirror of Course 5.

Deliverables built
I-170 · Work Package Change Register
Pi level — Package
09P5.C09Work Package Combined Performance ReportingAdvancedPerf. Intelligence

Produce the I-540 Work Package Combined Performance Report via IC01, IC06 and IC07 — productivity, combined cost and schedule performance, and package scope-change impact. The hand-off into P6 advanced intelligence.

Deliverables built
I-540 · Work Package Combined Performance Report
Pi level — Package
10P5.C10Integrated Issues & Decisions RegisterIntermediateInt. Controls

Build the M-180 Integrated Issues & Actions Register and the M-740 Master Issues Register & Escalation Log via MD10 and MA06, on a controlled cycle that feeds Course 13 decision packs.

Deliverables built
M-180 · Integrated Issues & Actions RegisterM-740 · Master Issues Register & Escalation Log
Pi level — Master
11P5.C11Scope Change Impact AnalysisAdvancedScope · Int. Controls

Assess cross-domain change impact via MC08, MC09 and MC10 to produce the M-750 Scope Change Impact Analysis Report — the gate for change approval. Requires Courses 3, 4 and 5.

Deliverables built
M-750 · Scope Change Impact Analysis Report
Pi level — Master
12P5.C12Scenario & What-If Analysis PackExpertRisk · Int. Controls

Rerun the schedule and cost risk models via MC11 and MC12 to produce the M-630 Scenario & What-If Analysis Pack. Received from P1, refreshed here, and jointly delivered with P4 risk.

Deliverables built
M-630 · Scenario & What-If Analysis Pack
Pi level — Master
13P5.C13Internal Decision Status & Baseline Change RecordAdvancedInt. Controls

Govern internal baseline change via MA07 and MA08 — M-660 Internal Decision Status & Baseline Change Record with M-340 Approved Cost Baseline maintained as the system of record. Senior judgement, documented.

Deliverables built
M-340 · Approved Cost BaselineM-660 · Internal Decision Status & Baseline Change Record
Pi level — Master
14P5.C14Independent Controls Review & Health AssessmentExpertPMC Governance

Close the assurance loop via GC01: an independent G-560 Controls Health Check & Assurance Review and a G-570 Controls Maturity Assessment rated against the Degree of Insights model. Hand-off to P7.

Deliverables built
G-560 · Controls Health Check & Assurance ReviewG-570 · Controls Maturity Assessment
Pi level — Governance
What you produce

You leave with the governed artefacts of an operating controls system.

Nineteen Pi v2.0 artefacts that progress from a conceptual strategy to an endorsed assurance verdict — the working portfolio of an integrated controls professional.

M-510Architecture
Integrated Controls Strategy
M-270Architecture
Progress Measurement Rules
M-530Cycle — Do
Earned Value Performance Report
M-520Cycle — Do
Change Control & Configuration System
M-240Cycle — Check
Progress Updated Master Schedule & Forecast
M-250Cycle — Check
Schedule Health & Quality Assessment
M-350Cycle — Check
Cost Forecast (EAC / ETC)
M-370Cycle — Check
Cost Trend & Variance Register
M-630Cycle — Check
Scenario & What-If Analysis Pack
M-750Cycle — Check
Scope Change Impact Analysis Report
M-180Cycle — Act
Integrated Issues & Actions Register
M-740Cycle — Act
Master Issues Register & Escalation Log
M-340Cycle — Act
Approved Cost Baseline
M-660Cycle — Act
Internal Decision Status & Baseline Change Record
I-530Package
Work Package Earned Value Update
I-170Package
Work Package Change Register
I-540Package
Work Package Combined Performance Report
G-560Assurance
Controls Health Check & Assurance Review
G-570Assurance
Controls Maturity Assessment
How it's structured

A progression of depth, tier by tier.

Tier governs depth; every course is delivered as a workshop with a structured coaching follow-up so capability sticks on a live controls cycle.

Four maturity tiers
Foundation1 course
Read & challenge
The controls operating model, the Pi v2.0 deliverable set and progress measurement rules.
Intermediate7 courses
Own the cycle
Earned value, change control, cost and schedule performance, issues register — at Master and Package level.
Advanced4 courses
Judgement under scrutiny
Forecast credibility, combined package performance, cross-domain change impact, internal baseline change.
Expert2 courses
Validate & assure
Scenario credibility, and the independent controls health check and maturity assessment.
How it's delivered
Full-day workshop≈ 6 effective hours — the primary delivery format for each course.
On-the-job coachingA structured follow-up review of your live EV pack, change register or forecast.
Virtual / hybridTwo 3-hour blocks with self-paced pre-reading, for distributed cohorts.
Capstone-linkedEach course feeds the capstone: two controls cycles closed by independent assurance.
14
Courses across four tiers, Foundation to Expert
19
Governed Pi v2.0 artefacts you produce
38
Pi v2.0 process codes operated across the program
G · M · Pkg
Pi levels covered — Governance, Master and Package
Questions

What controls professionals ask first.

Who is this program for?
Project Control Managers and Engineers, Cost Controllers, Planning Engineers, Reporting Analysts, Package Managers, Risk Managers, Project Directors and the Independent Reviewer function. It is the core program for the Project Control Manager pathway — all fourteen courses.
Do I need to take the courses in order?
Yes. The sequence sets the operating model first (Course 1), then builds the operational cycle (Courses 2–10), then the judgement layers (Courses 11–13), then closes assurance (Course 14). Once approved, the sequence cannot be reordered without governance sign-off.
How is this different from Program 6?
P5 owns the standard controls cycle and the performance pack that comes out of it. P6 picks that pack up and adds the advanced intelligence layer — KPI/KRI architecture, predictive analytics and decision-grade narrative. Course 9 (I-540) is the package-level hand-off.
What do I need before starting?
Nothing formal. The cycle operates against the approved integrated master schedule (M-220) from P1 and cost baseline inputs from P2 and P3 — if yours come from elsewhere, the same analysis applies.
What will I actually produce?
The operating artefacts of a controls system — strategy (M-510) and progress rules (M-270), two cycles of earned value (M-530) with M-240, M-250, M-350 and M-370, a full change cycle (M-520) with impact assessment (M-750), the issues and escalation set (M-180, M-740), a scenario pack (M-630), a baseline change record (M-660) against M-340, the package set (I-530, I-170, I-540), and the assurance outputs (G-560, G-570).
Is the program aligned to a standard?
Every course inherits its scope, processes and deliverables verbatim from Pi System v2.0 — its Process List, Deliverables Register, RASCQIE Matrix and Roles Register.
Pi Academy

Ready to run controls as an operating system?

Register your interest and we'll be in touch with cohort dates, delivery format and the enrolment path for your team.

Enrolment link coming soon — registering your interest reserves a place in the next cohort.